Individual grid charges as per §19 para. 2 Clause 2 StromNEV

The following network charge reduction has been approved by the Federal Network Agency in accordance with § 19, section 2, clause 2 StromNEV for the following end consumers in the grid area of TenneT TSO GmbH with power consumption from the general supply network with hours of use amounting to at least 7,500 h/a and power consumption of more than 10 GWh at one sampling point in the last calendar year.

Individual network charges in accordance § 19, section 2, clause 2 StromNEV

Clients

Client
Bundesnetzagentur reference
Dow Deutschland Anlagengesellschaft mbH BK4S2-0000471
VYNOVA Wilhelmshaven GmbH BK4S2-0000029
PreussenElektra GmbH - Kernkraftwerk Grafenrheinfeld BK4S2-0000599

 

Calculation component

for the determination of the individual grid fee according to sec. 19 para. 2 s. 2 StromNEV

Customers with their own generation or grid operators into whose grid such generation plants feed can order grid reserve capacity as a reserve for outages caused by faults or revisions with a time utilisation of up to 600 hours per billing year. The grid reserve capacity is limited to the agreed grid connection capacity and can be ordered until 15 December of the previous year.

Grid Reserve Capacity

Applicable as of 1 January 2022

 

Grid Reserve Capacity:

0 bis 200 h/a

€/(kW´Year)

> 200 bis 400 h/a

€/(kW´Year)

> 400 bis 600 h/a

€/(kW´Year)

Extra High Voltage
(Grid Sector 1)

Company-specific share

7.28

8.74

10,20

Nationwide share

23.30

27.96

32.62

Total fee

30.58

36.70

42.82

Transformation Extra High/High Voltage
(Grid Sector 2)

Company-specific share

6.99

8.38

9.78

Nationwide share

22.20

26.64

31.08

Total fee

29.19

35.02

40.86

The prices apply to the transmission system operated by TenneT TSO GmbH plus additional costs in accordance with the German Combined Heat and Power Act, plus additional costs arising from the implementation of the statutory requirements in accordance with Section 19 (2) StromNEV, plus offshore liability levy in accordance with Section 17 EnWG, plus further levies in accordance with statutory requirements, reactive power utilisation if applicable, concession levy if applicable and electricity tax and value added tax in the respective statutory amount. Prices include use of the grid infrastructure, system services and coverage of transmission losses.

Archive

Calculation component - for the determination of the individual grid fee according to sec. 19 para. 2 s. 2 StromNEV

Grid Reserve Capacity

Applicable as of 1 January 2021

 

Grid Reserve Capacity:

0 bis 200 h/a

€/(kW´Year)

> 200 bis 400 h/a

€/(kW´Year)

> 400 bis 600 h/a

€/(kW´Year)

Extra High Voltage
(Grid Sector 1)

Company-specific share

13.25

15.90

18.55

Nationwide share

15.80

18.96

22.12

Total fee

29.05

34.86

40.67

Transformation Extra High/High Voltage
(Grid Sector 2)

Company-specific share

13.08

15.70

18.31

Nationwide share

15.16

18.19

21.22

Total fee

28.24

33.89

39.53

The prices apply to the transmission system operated by TenneT TSO GmbH plus additional costs in accordance with the German Combined Heat and Power Act, plus additional costs arising from the implementation of the statutory requirements in accordance with Section 19 (2) StromNEV, plus offshore liability levy in accordance with Section 17 EnWG, plus further levies in accordance with statutory requirements, reactive power utilisation if applicable, concession levy if applicable and electricity tax and value added tax in the respective statutory amount. Prices include use of the grid infrastructure, system services and coverage of transmission losses.

Grid Reserve Capacity

Applicable as of 1 January 2020

 

Grid Reserve Capacity:

0 bis 200 h/a

€/(kW´Year)

> 200 bis 400 h/a

€/(kW´Year)

> 400 bis 600 h/a

€/(kW´Year)

Extra High Voltage
(Grid Sector 1)

Company-specific share

23.95

28.74

33.53

Nationwide share

11.08

13.30

15.51

Total fee

35.03

42.04

49.04

Transformation Extra High/High Voltage
(Grid Sector 2)

Company-specific share

23.59

28.30

33.02

Nationwide share

10.65

12.78

14.91

Total fee

34.24

41.08

47.93

 

Grid Reserve Capacity

Applicable as of 1 January 2019

 

Grid Reserve Capacity:

0 bis 200 h/a

€/(kW´Year)

> 200 bis 400 h/a

€/(kW´Year)

> 400 bis 600 h/a

€/(kW´Year)

Extra High Voltage
(Grid Sector 1)

Company-specific share

26.18

31.42

36.66

Nationwide share

5.00

5.99

6.99

Total fee

31.18

37.41

43.65

Transformation Extra High/High Voltage
(Grid Sector 2)

Company-specific share

28.86

34.63

40.41

Nationwide share

5.14

6.17

7.20

Total fee

34.00

40.80

47.61