Individual grid charges as per §19 para. 2 Clause 1 StromNEV

In accordance with §19, section 2 S. 1 StromNEV, TenneT TSO GmbH is required to offer an end consumer, in deviation from § 16 StromNEV, an individual grid charge if, based on existing or forecasted consumption data or based on technical or contractual circumstances, it is apparent that the peak load of an end consumer foreseeably deviates considerably from the simultaneous annual peak load of all sampling of this grid or transformer level.

Individual grid charges

Background information

According to the requirements of the BNetzA (Regulation of Power Network Charges), TenneT TSO GmbH must determine the respective peak load windows for the four seasons for each grid connection level (extra high voltage and transformation extra high/high-voltage).

Based on these peak load time windows, TenneT TSO GmbH shall offer an individual grid charge in accordance with § 19, section 2, clause 1 StromNEV to an end consumer, whose electricity consumption from the grid of the transmission grid operator for its own consumption at the customer's sampling point deviated considerably from the application filed in the past calendar year, or it can be shown credibly that a considerable deviation (see threshold of significance) of the annual peak load will occur for the following year.

Clients

Individual network charges in accordance § 19, section 2, clause 1 StromNEV

Client
Bundesnetzagentur reference
Uniper Kraftwerke GmbH, LGK Huntorf BK4S1-0002110
Kernkraftwerk Brokdorf GmbH & Co. oHG BK4S1-0000896
Kernkraftwerk Isar Verwaltungs GmbH BK4S1-0000274
Salzgitter Flachstahl GmbH BK4S1-0002134
Salzgitter Flachstahl GmbH BK4S1-0002166
Gemeinschaftskernkraftwerk Grohnde GmbH & Co. oHG BK4S1-0006124
Buderus Edelstahl GmbH BK4S1-0006214

Individual grid charges

with time windows

Grid / transformer level Threshold of significance
MaxVolt. 5%
Extra high/high-volt. 10%

The agreement to be made with the network user for reduced network charges in accordance with § 19, section 2, clause 1 StromNEV is subject to approval from BNetzA, and only becomes valid after presentation of the notice of approval.